eps线条搭设外墙脚架,符合安全作业用排栅; eps线条的清理安装平面,不能有浮灰,空鼓、突出物、风化物等影响粘贴强度的异物,平整度的要求以水平尺检查偏差,偏差应小于 5MM。待施工安装墙面,窗门洞口等施工程序已经完成后 基层清理。清理混凝土墙面上残留的浮灰、补充旧墙体隔空面、起鼓面要铲除、油污等杂物及抹灰空鼓部位等。
eps lines erection facades stand, in line with the safe operation of row grid; eps lines clean installation plane, can not affect the required floating dust, hollowing, projections, weathering etc. adhesive strength of foreign matter, the flatness deviation of the horizontal foot inspection deviation should be less than 5MM. Construction of the wall to be installed after the construction of windows and doors and other openings grassroots cleanup procedures have been completed. Cleanup on the concrete wall remaining floating dust, Taking a supplement of the old wall surface, from the drumhead to eradicate, oil and other debris and plaster hollowing and other parts.
配制砂浆。施工使用的砂浆是针对 EPS 基面要求而特殊配制的专用粘结复合型砂浆; 施工时用手持式电动搅拌机搅拌,搅拌必须充分、均匀,稠度适中。砂浆调制完毕后,须静置 5 min ,使用前再次进行搅拌,拌制好的砂应在3 小时内用完。
Preparation of mortar. Mortar construction used for EPS base surface and specially formulated proprietary adhesive composite mortar; stirred with a hand-held electric mixer construction, must be fully stirred, uniform, moderate consistency. After the completion of the mortar modulation shall stand for 5 min, stirring again before use, mixing good sand should be used within three hours.
要求粘贴聚苯板表面平整度偏差不超过 4MM,超差时对突出墙面处进行 打磨,对凹进部位进行找补抹平(需找补厚度超过 6MM 时用1:3 水泥砂浆抹灰,需找补厚度小于 6MM 时用聚合物粘结砂浆实施找补);以确保整个墙面的平整度在4MM 内,做到阴阳角方正、上下通顺。
Requirements paste polystyrene board surface flatness deviation does not exceed 4MM, tolerance when projecting the wall at the polished, smooth on the recessed parts of Zhaobu (required Zhaobu with 1:00 thickness exceeding 6MM: 3 cement mortar plastering need Zhaobu when the thickness is less than 6MM embodiment Zhaobu polymer adhesive mortar); to ensure the flatness of the entire wall in the 4MM, do yin and yang angle Founder, up and down smooth.