GRC构件在建筑物连接点的安装可以用多种方式,下面就来简单的介绍几种常见的方式。
GRC member installation of the building connection point can be used in many ways, the following brief introduction to several common ways.
1、采用焊接方式连接时,焊接钢筋时,双面焊缝长度不应小于5倍钢筋直径,单面焊接焊缝长度不应小于10倍钢筋直径。焊缝高度不小于3㎜,焊缝等级不低于二级,禁止使用点对点、点对面的焊接方式。
1, connected using welding, welding steel, double-sided weld length of not less than five times the bar diameter, single-sided welding seam length of not less than 10 times the bar diameter. Weld height of not less than 3 mm, weld rating of not less than two, prohibit the use of point to point, point opposite the welding.
2、当grc线条自重小于25kg时,安装连接点不少于4个,采用上下后左右连接;当GRC构件自重大于25kg时,每增加10kg,应至少增加两个连接点;连接点间距不得大于400㎜
2, when grc line weight less than 25kg, installation and connection point of not less than 4, about the connection after the up and down; when GRC component weight greater than 25kg, each additional 10kg, should be increased by at least two connection points; a connection point spacing can not be greater than 400 mm
**后grc线条厂家提醒大家在安装完毕后要做好防腐处理。
Finally grc line manufacturers to remind you to do after installation embalmed.